Soil investigation and protection concept
13.09.2023
Birsfelden (BL) − For the new construction of the drinking water reservoir on Rütihard between Muttenz and Münchenstein, approx. 4500 m² of cultivated soil will be temporarily exposed. HOLINGER was commissioned by the municipality of Birsfelden to investigate the soil quality, pollutant load and sensitivity for a soil protection concept and to prepare a specification for the pedological construction supervision.