Federal Roads Office
Street waste water treatment plant (SWWTP) Hallmatt
Project planning and realization of a SSWTP for the treatment of street waste water of the N12 national main road.
Special features:
- SWWTP with large catchment area
- 9 ha road surface area
- 38'000 vehicles per day
- 4 tons of pollutants per year
- 2-stage treatment process
- 7 pumping stations/ incident basins along the highway that feed the SWWTP
- Chip filter, and retention filter basin as pre-treatment
- Infiltration via soil passage into groundwater
Services provided by SWISSWATER:
Planning:
- Variant analysis
- Choice of the process
- Emergency incident concept
Project planning:
- Procedure / design
- Hydraulic system
- Structural design
- Estimate of costs
Realization:
- Entire plant
- E I&C system
- Monitoring support