Street waste water treatment plant (SWWTP) Hallmatt

Project planning and realization of a SSWTP for the treatment of street waste water of the N12 national main road.

Special features:

  • SWWTP with large catchment area
  • 9 ha road surface area
  • 38'000 vehicles per day
  • 4 tons of pollutants per year
  • 2-stage treatment process
  • 7 pumping stations/ incident basins along the highway that feed the SWWTP
  • Chip filter, and retention filter basin as pre-treatment
  • Infiltration via soil passage into groundwater

Services provided by SWISSWATER:

Planning:

  • Variant analysis
  • Choice of the process
  • Emergency incident concept

Project planning:

  • Procedure / design
  • Hydraulic system
  • Structural design
  • Estimate of costs

Realization:

  • Entire plant
  • E I&C system
  • Monitoring support